USA – California AT&T off – Grid Solar Site

Lorem ipsum dolor sit amet ipsum

We deployed 12×3.55kWh, 48VDc modules (42.6kWh) and reduced the DG runtime from 6 hours to 50 minutes which resulted in OPEX savings.